I still have a list of things to do as long as my arm, but tonight was a small milestone in the process of getting the truck back up and running again. Time to take the rest of the night off.

Dave

rick.m

DIESEL

#2 Post by rick.m » Mon Jun 19, 2006 10:16 pm

congrats DAVE, it sound very sweet, keep at it, IT IS GOING TO BE A PULLER!!!! RICK.M, from downtown KELOWNA TONITE, ...

nick
Learner Driver
Posts: 46
Joined: Fri May 26, 2006 8:32 am
Location: Chilliwack BC

#3 Post by nick » Mon Jun 19, 2006 11:18 pm

Good show dave, good show.
Will be great to see it done.

Cheers,
Nick

BTW: I like the hip as your shop music.

bclandrover
Out of Africa
Posts: 401
Joined: Wed Feb 25, 2004 11:21 pm
Location: North Vancouver
Contact:

#4 Post by bclandrover » Sun Jul 09, 2006 7:38 pm

Hey Dave,

Sounds great! Are you back on the road yet?

Later,
Don

DaveB
Defender of the World
Posts: 1749
Joined: Mon Feb 09, 2004 7:45 pm
Location: Vernon, BC

#5 Post by DaveB » Sun Jul 09, 2006 10:17 pm

Hi Don,

Well, I did drive it up and down the block today a couple of times, but here's my to-do list as of today:

End of Phase 1:
- new master cylinder
- knock out and replace front frame bushings with neoprene
- reinstall front wings
- wire front lights
- reinstall bumper & winch
- rewire rear lights
- finish battery box in rear
- re & re transmission and install new synchro springs
- repair broken transmission mount
- fabricate hand brake linkage to make room for the exhaust
- install exhaust system

Phase 2
- bracket for intercooler
- remove egr manifold setup and install simplified intake pipe, thus allowing room for intercooler hoses
- plumb intercooler

Ripping up and down the road today, I was pretty impressed with the power and got it up to about 14 pounds boost in second gear. Should be fun to get used to...

Dave
Last edited by DaveB on Mon Jul 10, 2006 9:43 pm, edited 1 time in total.

bclandrover
Out of Africa
Posts: 401
Joined: Wed Feb 25, 2004 11:21 pm
Location: North Vancouver
Contact:

#6 Post by bclandrover » Sun Jul 09, 2006 11:34 pm

Hey Dave,

That's no simple phase one list. I guess your using the disco for this summers activities!!

Later,
Don

DaveB
Defender of the World
Posts: 1749
Joined: Mon Feb 09, 2004 7:45 pm
Location: Vernon, BC

#7 Post by DaveB » Mon Jul 10, 2006 12:45 pm

It may seem a long list, but compared to my original phase 1 list it's now pretty short. I didn't include the actual re & re of the diesel engine in this list, just the things that have had to be done since the initial install. Even though there's lots to do yet, I'm feeling pretty good, compared to what had to be done. The items with this symbol: √ are completed -- it shows as a check mark in my browser, but may be a different symbol on yours.

Clutch
√ bleed
√ resolve clutch linkage issue
- lengthen actuator at m/c
Cooling system
√ mount expansion bottle
√ properly mount heater (may require heater disassembly and resealing)
√ link small hose on front lower rad hose to expasion bottle
√ shorten lower rad hose to clear fan belts (may not be needed)
√ top up system
√ buy matched rad caps
Oiling system
√ repair leaks in front mounted oil cooler
Fuel system
√ properly mount fuel filter unit on left wing
√ install accelerator cable
√ inspect lines for rubbing and add protection where required
Electrical system
√properly wire in glow plug curcuit
- finish battery box cover
√ remove extra curcuits from new wiring harness
√ install new fuse box
√ install new wiring harness
√ wire up all engine components
- wire up front lighting
- wire up rear lighting, and other rear components
√ wire up dash and ignition
√ fix routing of hot cable to starter
√ hook up all curcuits and test
√ Add additional curcuit for manual fan override
√ wire in new guages
√ finish guage and switch panel
Old repairs
- lubricate rear u-joint or replace
- replace front spring bushings with neoprene
- remove transmission and replace spring clip on synchro
- replace transmission mounts
- lower rear transmission crossmember 1 inch
√ repair steering tie rod ends
√ reroute brake line to the rear brakes.
- replace brake master cylinder & bleed
Air Intake
√ build outlet for airbox to turbo intake
√ build bracket for airbox and mount it
- build intercooler bracket
- plumb intercooler
- fabricate snorkel & install
Exhaust
- reroute hand brake linkage on right hand side to make room for exhaust
- take to muffler shop to install 2 1/4" exhaust inside the frame
Body
- reinstall front bumper and hook up winch
- reinstall floor
- reinstall wings and hood
- add sound deadening to interior
- add new drivers door lock
- reinstall doors
- install hard top with open sides
- measure and mark curtains and take for sewing $150
√ reinstall fuel carrier on rear tailgate

Dave

John
Cylinder bore
Posts: 469
Joined: Tue Mar 23, 2004 8:37 pm
Location: Langley, BC

#8 Post by John » Mon Jul 10, 2006 2:20 pm

- take to muffler shop to install 2 1/4" exhaust inside the frame
Dave what do you have in mind here. Some military 109's used to have the exhaust routed through a hole in the center box section of the chassis and on many that I have seen this then became a new place for chassis rot.

John

DaveB
Defender of the World
Posts: 1749
Joined: Mon Feb 09, 2004 7:45 pm
Location: Vernon, BC

#9 Post by DaveB » Mon Jul 10, 2006 6:19 pm

Inside the frame rails, as opposed to underneath the various crossmembers. There is room on the right side, inside the frame rail if I do a bit of change to the park brake linkage, specifically the vertical rod on the right side.

i've seen too many custom exhausts lately that are hanging too low and just waiting to get hit. I've got the opportunity to keep the entire system up in between the frame rails and thats where I hope the exhaust installer will agree...

Dave

DaveB
Defender of the World
Posts: 1749
Joined: Mon Feb 09, 2004 7:45 pm
Location: Vernon, BC

#10 Post by DaveB » Mon Jul 10, 2006 9:36 pm

New check marks tonight:

√ lengthen clutch actuator at m/c
√ install new brake master cylinder
√ bleed brakes

Test run: ripping up and down the local farm road a few times. woo hoo!!

√ hammer out front frame bushings on one side.

Tomorrow night I'll try and finish the bushings, and wire the rear lights. I can then insure it and actually drive it on the road. Then a week or two of all the little bits...

Hmmm, maybe I should just leave the exhaust like this. Sure can hear that turbo wind up.

D

DaveB
Defender of the World
Posts: 1749
Joined: Mon Feb 09, 2004 7:45 pm
Location: Vernon, BC

#11 Post by DaveB » Tue Jul 11, 2006 7:52 pm

√ replace front spring bushings with neoprene

Both sides now done. For the first time I used a sawzall to cut through the old bushing sleeves. This turned a 30 minute cut and cuss job into about 15 seconds with the question coming up... oops, did I cut too far?

Actually I tested first on an old hunk of metal. The sawzall with a 9 inch extra heavy duty Search and Rescue quality blade is an amazing piece of equipment and ate through the steel sleeve like a hot knife through butter. This one is Andrews. gotta get me one of these!

Now out to wire the rear lights, then insurance in the morning. Still not ready to go cruising in the bush, but at least I'll be able to say its back on the road.

Dave

DaveB
Defender of the World
Posts: 1749
Joined: Mon Feb 09, 2004 7:45 pm
Location: Vernon, BC

#12 Post by DaveB » Thu Jul 13, 2006 7:42 am

√ wire up rear lighting, and other rear components
√ reinstall wings and hood